A wet spring - Update # 35

27 April 2016

Deep silence from La Fromagerie, where the Easter school hols and rain have slowed the pace somewhat, but Tom has written to say:

The galvanised plates at the bottom of the 4 oak posts are bedded in the concrete pads (and) this concrete had to be left to cure for a week or so. I didn't want to crack the concrete by banging around with new rafters etc. This time has obviously passed now and I am desperate to move on with the roof of the covered terrace. I have all the new oak rafters on site and I have cut the oak ridge. I have the chestnut volige boards ready to go too.
So, with any luck, and a break in the weather, we'll be getting a photo update very soon.